Have the page read aloud:
This is a refurbishment in an inhabited state in which the facades and roofs will be redone or repaired. The following work will also be carried out:
- Bathroom/staircase refurbishment
- Renovation of stairwells
- Construction of the technical rooms, new meter systems, new sub-distribution boards in the flats
- Laying fibre optic cables in the flats.
- Installation of new intercom systems and letterboxes
- Replacement of windows and shutters
- Replacement of the flat and building entrance doors
- Insulation of the KG ceiling
- Redesign of the outdoor facilities
- Conversion to district heating
- E-mod of empty flats
We apologise for any inconvenience caused by the construction work!
Modernisation period from 2023 until 2025
2
years
Modernisation period from 2023 until 2025